Ok, I have not updated my blog in a while so here come a lot of pictures!
Mostly we have been tiling.
Here are pictures of the 3rd floor master bath. Man did we put a lot of tile in there. (Thanks Kristens family for all the help!)
Looking at the back wall and the tub surround:

Completed back wall/tub surround:

Recessed Medicine Cabinets over the vanity:

Bathroom Entry:

Shower Area:

Finished Shower Area:

Finished Shower Area:

Grouted Area above toilet:

Grouted area above bath tub:

Grouted Shower Area:

Now for some 2nd floor bath pictures.
This is the start of the back wall/tub/shower surround:

Back wall, these are very nice glass subway tiles:

Shower Area (Kristen did not like the blue tiles in there, so they were removed):

Shower Area:

Window in the Shower area:

Finished Shower Area:

Back wall/Shower area:

Kristen Grouting the back wall :)

Cleaning the grout off of the wall:

Completed Back wall:


Leave a comment