We are moving full steam ahead :)
They have finished framing the basement and 1st floor. They have paved the basement. We got our windows in and they are installing them. They have added the stairs. We have ordered our tile and hardwood floor. We have ordered our cabinets.
All is going at a great pace right now. They are starting on the electrical and hopefully soon the plumbing.
Here are some pictures:
I have completed putting up the old columns, now we just need to finish painting them (hint hint if someone wants to help)
![IMG_0283[1].jpg](http://WWW.craigsirk.com/IMG_0283%5B1%5D.jpg)
First Floor bathroom.
![IMG_0295[1].jpg](http://WWW.craigsirk.com/IMG_0295%5B1%5D.jpg)
Basement:
![IMG_0296[1].jpg](http://WWW.craigsirk.com/IMG_0296%5B1%5D.jpg)