Day Thirteen, Fourteen

| | Comments (0)

I am finally done with stage two of the first floor wall. Stage one was to remove the plaster, stage to was to remove the morter and grout between the bricks to I can re-point it.

Man that took a long time but I think I will look very nice when it is finished. I now have moved to stage three which is replacing any broken bricks or cracks in the wall.

Then stage four is to power wash the wall to clean it up.

Then on to stage five which is re-pointing the brick.

And lastly stage six is sealing the brick.

Leave a comment

Blogs

Web Design

Toons

Games

Links

Archives

Powered by Movable Type 4.12